Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e90d1f739ac00248caaa0XB5AS9442XB5AS9442

D40 EMERGENCY STOP KR 455E

ITM32119
INR9999999Out of Stock
Schneider Electric
11

Images are for reference only.

  • Part Number:
    XB5AS9442
  • Manufacturer:
  • Description:
    Emergency Stop
  • Detailed Description:

    D40 EMERGENCY STOP KR 455E

  • Authorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Brief

This Harmony XB5, emergency stop / shutdown 40mm mushroom head modular red push button operates with a latched key release (key no.455) mechanism and uses screw-clamp terminals. This emergency stop / shutdown button, also called EMS (Emergency Machine Stop) and EMO (Emergency Off) is easily installed into a standard 22mm diameter cut-outs and connected with simple screw-clamp connections. It is clearly distinguishable visually at a distance thanks to a clear color and a prominent 40mm mushroom shape. It is impact resistant, dust resistant, water resistant and vibration resistant thanks to its IP66, making it ideal for operation in harsh environments. Its plastic bezel makes it ideal for applications requiring good resistance to chemical agents and/or double electrical insulation.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Module Carrier Frame

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Socket

O/E/N

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 /
8 Weeks
On Request

Dip Switch

O/E/N

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
12 Weeks
On Request
Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
16 Weeks
On Request

IC Socket

Amphenol Communications Solutions

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
2016 / 2016
8 Weeks
On Request

Emergency Stop

Schneider Electric

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks
On Request

Delivery