Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e991fffb37e002becfd71XB4BVB5XB4BVB5

24 V LED PILOT LIGHT BODY

ITM20452
INR9999999Out of Stock
Schneider Electric
11

Images are for reference only.

Franchise : Authorised Distributor

Product Brief

This Harmony XB4 plain lens modular orange pilot light is supplied with 24V AC/DC, uses an integral LED. It has a metal bezel. This pilot light, designed to last without maintenance for a bright indication of process and machine operations, is easily installed into standard 22mm diameter cut-outs and connected with simple screw-clamp connections. It is clearly distinguishable visually at a distance thanks to a bright and long lasting LED illumination. It is impact resistant, dust resistant, water resistant and vibration resistant thanks to its IP66 / IP67 / IP69 / IP69K, making it ideal for operation in harsh environments.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Pushbutton

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Parallel Splice

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 1000
32 Weeks
On Request
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
3000 /
On Request

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
6 Weeks

PCB Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks
On Request

PCB Plug

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
6 Weeks
On Request

Appliance Outlet

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
5000 / 100
10 Weeks
On Request

SMD Fuse

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 100
9 Weeks
On Request

Pilot Light

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Industrial Plug

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
4 Weeks
On Request
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
On Request

Delivery