Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e99422f8da800240a739cABLP1A24100ABLP1A24100

POWER SUPPLY 24V 10A PANEL MOUNT

ITM31363
INR6324In Stock
Schneider Electric
11

Images are for reference only.

  • Part Number:
    ABLP1A24100
  • Manufacturer:
  • Description:
    Power Supply
  • Detailed Description:

    POWER SUPPLY 24V 10A PANEL MOUNT

  • Authorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Brief

This Modicon ABLP regulated switch mode power supply (SMPS) supplies direct current voltage. It has a rated input of 100V to 240V AC, a rated output current of 10A at 24V DC and a rated power of 240W. It is ideal for supplying DC voltage necessary for automation equipment designed for applications in industrial, commercial and residential applications such as conveying, packaging, control, food & beverage, mining, oil & gas and water. It provides a protection against overloads and short-circuits with automatic restart after the source of overload/short-circuit has been corrected It has LED diagnostics indicator available in the front for troubleshooting instantly. Its width is 190mm, its height is 50mm, its depth is 93mm. It weighs 0.850kg. It is certified with CB-Scheme, cULus Listed, cURus recognized, RCM and EAC. It is a power supply for commercial use, panel mount; It is compatible with ABLPA02 mounting plate. It installs on panel on side or on base with mounting plate fixing by screw. ABLP power supplies bring energy to your automated systems. ABLP power supplies are designed for simple and repetitive machines, dedicated power supplies are particularly quality/price competitive due to their simplicity and compactness. The main applications to use Modicon ABLP power supply are lifts, display panels, escalators, carwash, foodstuff ovens, etc.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

RELAY

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10000 / 30
10 Weeks
On Request

Relay

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1500 / 30
8 Weeks
On Request

Fuse Drawer

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 50
9 Weeks
On Request

Terminal

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
8000 / 8000
16 Weeks
On Request

Crimp Contacts

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1600 / 1600
8 Weeks
On Request

Housing

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
6000 / 6000
16 Weeks
On Request

STRAIN RELIEF

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Connector Accessories

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
150 / 150
16 Weeks
On Request

Power Entry Module

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
200 / 100
8 Weeks
On Request

Lock

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
2000 / 2000
16 Weeks
On Request

Power Supply

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks

Housing

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
16 Weeks
On Request

Connector

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 500
20 Weeks
On Request

Connector

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1300 / 1300
16 Weeks
On Request

Power Entry Module

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 50
9 Weeks
On Request

Accessories

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
200 / 100
8 Weeks
On Request

Delivery