ZB 8 LGS 11-20

  • Manufacturer:
  • Manufacturer Part Number:

    ZB 8 LGS 11-20

  • 1052015:0011

  • Description:

    Marker

  • Detailed Description:

    8mm Horiz marker strip labelled 11-20, 10-section

  • Icon
Franchise : Authorised Distributor
Logo

Why you should choose ARC

Leading Authorized Distributor of Electronic Components since 1968

Product Attributes

#AttributeValue
1.brandPhoenix Contact

In StockIn Stock : 20

Typicaly ships in 48 hrs from Bangalore, India

Sold In :PCS
Minimum Order Quantity (MOQ): 50
Standard Packing Quantity (SPQ): 50
Lead Time: 6 Weeks
HSN Code:39269099

Pricing (includes all local taxes)

QuantityUnit Price
50₹11.9

For bulk pricing on this item please request a quote

20 item left in Stock

Standard Lead Time: 6 Weeks

Delivery

IconFor custom pricing and inventory info, add to quote
IconFree delivery on bulk orders
IconWe are an Authorized distributor
Icon

Frequently Asked Questions

The Request for quote feature (available for registered users only) allows you to select products you need and add them to your RFQ cart. You can then Request for a quotation with your Target Price and receive a customised offer.

To submit an RFQ, click the "Add to Quote" button for the product you need. Navigate to the RFQ cart on top right corner of your screen. Our team will respond with pricing, stock availability, lead times, and incoterms.

Yes, you must register to be able Request for Quote. And Yes, we do offer special pricing.

Typicaly 12-48 hours. However, it can take longer with some products. You are assigned a key account manager as soon as you place a RFQ, who will keep you updated about your request. any delays.

Yes. All our our products are purchased directly from the Manufacturer (or a pre-defined authorised channel). By default all warranties extended by the Manufacturer would extend to you as purchaser. And yes, we can provide a COC on request.
For more informationContact Us

Recently Viewed

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 3000
32 Weeks

POWER CHORDS

Elcom

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 100
5 Weeks

Power Cord

Elcom

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks

Power Cord

Elcom

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 10
4 Weeks

RELAY

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 900
16 Weeks

VFD

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Marker

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
6 Weeks

Connector

Amphenol Industrial Product Group

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 150
5 Weeks
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

VFD

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks

TB Marker

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
5 Weeks

Housing

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
20 Weeks

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1200 / 300
8 Weeks

VFD

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

Circuit Breaker

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

LED INDICATOR

Bulgin Limited

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 500
14 Weeks

Circuit Breaker

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Tool

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks

Delivery