Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670ea9ef7e39ce002b8277fcXENT1192XENT1192

CONTACT BLOCK

ITM18498
INR5323In Stock
Schneider Electric
11

Images are for reference only.

Franchise : Authorised Distributor

Product Brief

This product is part of the Harmony XAC range, an offer of pendant control stations for �22mm plastic signalling units. This single isolating block for control circuit. It has 3 normally closed contacts. It is an isolating block with a rated insulation voltage of 400V and a conventional enclosed thermal current of 10A. It is designed for front mounting with slow-break contact operation. It is furnished with screw clamp terminals for electrical connection. It offers mechanical durability of 1 million operating cycles. It weighs 0.05kg. It is suitable for industry and service sector, hoist and travelling cranes. It meets CSA C22.2 No 14, UL 508, EN/IEC 60947-5-1 and EN/IEC 60204-32 standards. It is compatible with the pendant control stations XACA. It is designed for mechanical handling, these highly robust pendant control stations comply with the safety requirements of IEC standards. They are not only simples and intuitive, but also very comfortable for the operator to use.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Hand Tool

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 1
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Pendant Station Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks

PLC Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
4 Weeks
On Request

Crimp Contact

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
14 Weeks
On Request

Delivery