Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e9859ea3eae00320ed033VW3A1007VW3A1007

REMOTE LED DISPLAY IP65

ITM31640
INR9999999Out of Stock
Schneider Electric

VW3A1007

Images are for reference only.

Franchise : Authorised Distributor

Product Brief

This remote terminal is an option for variable speed drives of Altivar range. It is a dialogue option for the variable speed drive. Its protection index is IP65. This terminal is used to locate the Human-Machine Interface of the Altivar drive remotely on the door of an enclosure. Its maximum operating temperature is 50 �C. It weighs 275g. It is used to ccntrol, adjust, and configure the drive remotely, display the drive status and error codes. A remote-mounting cordset VW3A1104Rxx is also required, to be ordered separately. The ATV12 range meets basic machine requirements united with simplicity.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
352 / 352
12 Weeks
On Request

MEDI-SNAP size 1 / 7pin straight plug

ODU

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

IEC Power Connector

Bulgin Limited

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 100
14 Weeks
On Request

Power Supply

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
4000 / 4000
16 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10000 / 10000
18 Weeks
On Request

VFD Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks
On Request

Coupler Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

TERMINATION

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1260 / 630
16 Weeks
On Request

Housing

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
2800 / 2800
16 Weeks
On Request

Delivery