Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670ead2c2f8da800240a9828TM3DI32KTM3DI32K

MODULE TM3-32 INPUTS HE10

ITM18187
INR9999999Out of Stock
Schneider Electric

TM3DI32K

Images are for reference only.

Franchise : Authorised Distributor

Product Brief

This digital input module is part of the Modicon TM3 range of I/O expansion modules for Modicon controllers. It consists in 32 logic inputs and it is supplied with 24V dc. It is equipped with one removable HE10 connector and can be mounted on a symmetrical DIN rail 35 mm. This digital I/O module complement the embedded I/O on Modicon M221, M221 Book, M241 and M251 logic controllers. There is an insulation between input and internal logic at 500V AC and non-insulation between inputs. It is furnished with HE-10 connector inputs for electrical connection. It is an IP20 rated product. Its dimensions are 23.6mm (Width) x 70mm (Depth) x 90mm (Height). It weighs 0.11kg. This product is certified by CE. It meets EN/IEC 61131-2 and EN/IEC 61010-2-201 standards. This module is compatible with Modicon M262, Modicon M241, Modicon M251 and Modicon M221 logic controller. It supports top hat type TH35-15, top hat type TH35-7.5 rail conforming to IEC 60715 and plate or panel with fixing kit mount. Modicon TM3 expansion modules have been designed with a simple interlocking assembly mechanism. A bus expansion connector is used to distribute data and the power supply when assembling the Modicon TM3 modules with logic controllers. Boost the performance of your controller with the Modicon TM3 I/O system specially designed for the Modicon M221, M241 and M251 logic controllers.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
2 Weeks
On Request

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
5000 / 5000
2 Weeks
On Request

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
5000 / 5000
2 Weeks
On Request

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
2 Weeks
On Request

Connector

Amphenol

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
16 Weeks
On Request

Circular Connector

Amphenol

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
16 Weeks
On Request

Connector

APTIV

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
3600 / 3600
16 Weeks
On Request

Connector

JST

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 1000
32 Weeks
On Request

Terminal

JST

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 2000
On Request

Transistor

CDIL

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
6 Weeks
On Request

Ferrule

Cembre

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1500 / 100
8 Weeks
On Request

PCB Terminal Block

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
5 Weeks
On Request

Accessories

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks
On Request

Contactor Acc

Schneider Electric

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks
On Request

TB Marker

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
6 Weeks
On Request

PLC Acc

Schneider Electric

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Connector

Amphenol

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Cable Sleeve

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 10
6 Weeks
On Request

Insertion Bridge

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 10
6 Weeks
On Request

Connector

Amphenol

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Delivery