Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670eac04ea3eae00320efb67RXM3AB2BDRXM3AB2BD

MINIATURE RELAY LED 3C/O 24VDC

ITM18396
INR464In Stock
Schneider Electric
11

Images are for reference only.

Franchise : Authorised Distributor

Product Brief

RXM miniature relays are part of Harmony Electromechanical Relays. This is a plug in relay to be mounted on a RXZE socket. It is a 3 C/O relay with current rating of 10A, control circuit voltage of 24 V DC. It also offers one-step loackable test button and mechanical indicator for contact status. The testbutton is activated momentarily by pushing the blue pushbutton on the front and locked by flipping up the green part. The mechanical indicator is next to the testbutton, where an orange flag indicates the relay contact status. A green LED on the front will illuminate when the relay is on. Status display with LED: clearly signal both in the day and night. Its design is fit for industrial machines, packaging, textile, HVAC, automation control panels, low/medium voltage switchgear, motor controls, PLC Interfaces, power supplies, building or medical equipment, lighting controls. It is a green premium product and conforms to international standard and certifications like IEC, CE, UL, CSA, EAC, Lloyd's, RoHS and REACH. RXM Relay should be used with a RXZE socket (screw clamp, screw connector, push-in terminal). To protect against vibrations, plastic/metal clamp can be added to the socket. Protection modules and marking legend are also available. It is sold in lots of 10 and reference includes relay only. The RXM plug-in relays are a series of industrial plug-in relays designed for both simple and complex automation systems and available with 2 CO (12A), 3 CO (10A), 4 CO (6A) contacts, 4 CO (3A) low level contacts.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
305 / 305
10 Weeks
On Request

UV LED

Seoul Viosys

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
10 Weeks
On Request

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
16 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
4000 / 4000
18 Weeks
On Request

Ring Tongue Terminal

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 200
32 Weeks
On Request

TERMINAL

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 3200
32 Weeks
On Request

DC Cooling Fans

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
4 Weeks
On Request

INST.COOLING FAN

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
8 Weeks
On Request

DC Cross Flow Fan

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
6 Weeks
On Request

DC Fan

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
8 Weeks
On Request

Flat Label Holder

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
8 Weeks
On Request

Plug In Relay

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks

HEAT SHRINK TUBE

Sumitomo Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1200 / 400
16 Weeks
On Request

DIN Rail

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 20
5 Weeks
On Request

Insulation Body

ODU

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks
On Request

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
2000 / 2000
18 Weeks
On Request

LED

Paralight

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
16 Weeks
On Request

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
22 Weeks
On Request

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
20 Weeks
On Request

Delivery