PT 5-HF-12 DC-ST

  • Manufacturer:
  • Manufacturer Part Number:

    PT 5-HF-12 DC-ST

  • 2838775

  • Description:

    Surge protection plug

  • Detailed Description:

    SURGE PROTECTION PLUG ,12VDC

  • Datasheet:Datasheet Icon
  • Icon
Franchise : Authorised Distributor
Logo

Why you should choose ARC

Leading Authorized Distributor of Electronic Components since 1968

Product Attributes

#AttributeValue
1.brandPhoenix Contact

Inventory on RFQ
? Add to quote to get stock availability and pricing.

Sold In :PCS
Minimum Order Quantity (MOQ): 1
Standard Packing Quantity (SPQ): 10
Lead Time: 5 Weeks
HSN Code:85363000

Pricing (includes all local taxes)

QuantityUnit Price
1₹2,351.7

For bulk pricing on this item please request a quote

Standard Lead Time: 5 Weeks

IconFor custom pricing and inventory info, add to quote
IconFree delivery on bulk orders
IconWe are an Authorized distributor
Icon

Frequently Asked Questions

The Request for quote feature (available for registered users only) allows you to select products you need and add them to your RFQ cart. You can then Request for a quotation with your Target Price and receive a customised offer.

To submit an RFQ, click the "Add to Quote" button for the product you need. Navigate to the RFQ cart on top right corner of your screen. Our team will respond with pricing, stock availability, lead times, and incoterms.

Yes, you must register to be able Request for Quote. And Yes, we do offer special pricing.

Typicaly 12-48 hours. However, it can take longer with some products. You are assigned a key account manager as soon as you place a RFQ, who will keep you updated about your request. any delays.

Yes. All our our products are purchased directly from the Manufacturer (or a pre-defined authorised channel). By default all warranties extended by the Manufacturer would extend to you as purchaser. And yes, we can provide a COC on request.
For more informationContact Us

Recently Viewed

RETAINER

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 1000
32 Weeks

Crimping Lug

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
25 / 25
8 Weeks

Twin End Sleeve

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
2500 / 100
8 Weeks

Connector

3M

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
6 Weeks

Connector

EDAC

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
25 / 25

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
34000 / 1000
12 Weeks

Relay Module

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 10
6 Weeks

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks

Surge protection plug

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 10
5 Weeks

HEAT SHRINK TUBE

Sumitomo Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1050 / 350
14 Weeks

MCCB Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks

Terminal

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
24 / 24
16 Weeks

Connectors

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks

Relay Base

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 10
5 Weeks

Contactor

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Feed-Through Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
10 Weeks

PCB Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks

Pilot Light

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10 / 10

Contactor

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks

Delivery