Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670ebd2cf739ac00248d099dC1553ATNAEC1553ATNAE

Rocker Switch C1553ATY T.BLACK 1 RED 230V

ITM16783
INR11799998.82Out of Stock
Bulgin Limited
11

C1553ATNAE

  • Manufacturer:
  • Manufacturer Part Number:

    C1553ATNAE

  • Description:

    Rocker Switch

  • Detailed Description:

    Rocker Switch C1553ATY T.BLACK 1 RED 230V

  • Datasheet:Datasheet Icon
  • IconIcon
Franchise : Authorised Distributor

Why you should choose ARC

Leading Authorized Distributor of Electronic Components since 1968

Product Attributes

#AttributeValue
1.brandBulgin Limited

Inventory on RFQ
? Add to quote to get stock availability and pricing.

Sold In :PCS
Minimum Order Quantity (MOQ): 1000
Standard Packing Quantity (SPQ): 100
Lead Time: 14 Weeks
HSN Code:85365090

Pricing (includes all local taxes)

QuantityUnit Price
1000On RFQ
?
Add to quote to get pricing.

Standard Lead Time: 14 Weeks

IconFor custom pricing and inventory info, add to quote
IconFree delivery on bulk orders
IconWe are an Authorized distributor
Icon

Frequently Asked Questions

The Request for quote feature (available for registered users only) allows you to select products you need and add them to your RFQ cart. You can then Request for a quotation with your Target Price and receive a customised offer.

To submit an RFQ, click the "Add to Quote" button for the product you need. Navigate to the RFQ cart on top right corner of your screen. Our team will respond with pricing, stock availability, lead times, and incoterms.

Yes, you must register to be able Request for Quote. And Yes, we do offer special pricing.

Typicaly 12-48 hours. However, it can take longer with some products. You are assigned a key account manager as soon as you place a RFQ, who will keep you updated about your request. any delays.

Yes. All our our products are purchased directly from the Manufacturer (or a pre-defined authorised channel). By default all warranties extended by the Manufacturer would extend to you as purchaser. And yes, we can provide a COC on request.
For more informationContact Us

Recently Viewed

Transistor

CDIL

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 3000
12 Weeks
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 1
8 Weeks

Oil Reservoir

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
8 Weeks

Multi-Cond Cable

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
305 / 305
30 Weeks

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
6 Weeks

MEDI-SNAP size 1/10Pin/receptacle style 5

ODU

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
7 Weeks
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

Rocker Switch

Bulgin Limited

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 100
14 Weeks

Feed Through Header

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
3 Weeks

Circuit Breaker

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
5 Weeks

Ground Modular Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 50
12 Weeks

Contactor

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

VFD

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Push Button Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
6 Weeks
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 500
20 Weeks

CONTACTS

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks

Delivery