Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e72a9f739ac00248c5670ATS22C21QATS22C21Q

SOFT STARTER 210A 440V 230V CTRL

ITM36048
INR9999999Out of Stock
Schneider Electric
11

Images are for reference only.

  • Part Number:
    ATS22C21Q
  • Manufacturer:
  • Description:
    Soft Starter
  • Detailed Description:

    SOFT STARTER 210A 440V 230V CTRL

  • Authorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Brief

This Altistart 22 soft starter can feed 3-phase asynchronous motors in supply line or delta connection. It has a rating of 210A and 230V to 440V, a rated power up to 110kW (400V to 440V in supply line) and up to 160kW (400V to 440V in motor delta connection). It is designed for simple and complex machines such as centrifugal and piston pumps, fans, screw compressors and material handling equipment. Slim form factor improves versatility; allows mounting in frames of any kind of machines. It features an Integrated bypass, this reduces noise and decreases heat dissipation. Compatibility with SoMove software allows configurations and settings to be easily transferred, meaning spares can be quickly installed. It provides smooth starting for your machinery, avoiding mechanical stresses and extending their service life.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

FO converters

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Termination Resistor

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
5 / 5
14 Weeks
On Request

Transistor

CDIL

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
14 Weeks
On Request

Relay

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
8 Weeks
On Request

Flat Ribbon Cable

3M

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 30
6 Weeks
On Request

Interface Module

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 5
6 Weeks
On Request

Circuit Breaker

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
10000 / 10000
16 Weeks
On Request

Backshell

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
10 Weeks
On Request

Soft Starter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Circuit Breaker Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Delivery