Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670e8448c62c0600326e141bATS01N212QNATS01N212QN

SOFT-START STOP 12A 380 415V

ITM22543
INR9999999Out of Stock
Schneider Electric
11

Images are for reference only.

  • Part Number:
    ATS01N212QN
  • Manufacturer:
  • Description:
    Soft Starter
  • Detailed Description:

    SOFT-START STOP 12A 380 415V

  • Authorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Brief

This Altistart 01 soft starter is DIN rail mounted and can feed 3-phase asynchronous motors with a rating up to 12A. This Altistart 01 can be used for a motor rated power up to 3kW or 3hp for 3-phase (200V to 240V AC). This DIN rail mounted soft starter is designed to enable smooth start for simple machines such as conveyors, conveyor belts, pumps, fans, compressors, automatic doors and gates, small cranes and belt-driven machinery. It is 45mm wide, this makes it one of the smallest soft starters on the market; it can be installed nearly everywhere. It features an Integrated bypass, this reduces noise and decreases heat dissipation. Simple setup with only 2 settings: possible to configure by non-specialists. It provides smooth starting for your machinery, avoiding mechanical stresses and extending their service life.

Product Attributes

AttributeValue
brandSchneider Electric

Recently Viewed

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
16 Weeks
On Request

AC Fan

ebmpapst

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
18 Weeks
On Request

90 Deg Angled Copper Lug

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
8 Weeks
On Request

Flat Ribbon Cable

3M

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
6 Weeks
On Request
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
20 Weeks
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

VFD Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
4 Weeks
On Request

Servo Drive Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Servo Drive Acc

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
4 Weeks
On Request

Vario Switch

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks
On Request

PCB Header

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
8 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 500
26 Weeks
On Request

Soft Starter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

Die Set

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

Delivery