• Part Number:
    6719 BK001
  • Manufacturer:
  • Description:
    Hook-Up Wire
  • Detailed Description:
    10AWG Hook-Up Wire 105/30 BLACK 600V 1000ft(305m)
  • RoHS IconRoHSAuthorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Attributes

AttributeValue
Cable TypeHook-Up
Wire Gauge10 AWG
Conductor Strand105/30
Conductor MaterialCopper, Tinned
Jacket (Insulation) MaterialPolyphenylene Ether, Modified (mPPE)
Jacket (Insulation) Diameter0.144" (3.66mm)
Jacket (Insulation) Thickness0.012" (0.30mm)
Length1000.0' (305m)
Voltage600V
Operating Temperature-40�C ~ 105�C
Jacket ColorBlack
RatingsUL Style 11028
brandAlpha Wire

Recently Viewed

Buzzer

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

DC Fan

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
On Request

INSTRUMENT COOLING FAN

Sofasco

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
8 Weeks
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
305 / 305
30 Weeks
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
7 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
7 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
3 Weeks
On Request

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Ground Modular Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks
On Request

Feed Through Header

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
250 / 250
5 Weeks

Cable Assembly

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Delivery