• Part Number:
    6712 WU005
  • Manufacturer:
  • Description:
    Hook-Up Wire
  • Detailed Description:
    24 AWGHook-UpWire 7/32 WhiteBlue 600V 100FT(30.5m)
  • Authorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Attributes

AttributeValue
Cable TypeHook-Up
Wire Gauge24 AWG
Conductor Strand7/32
Conductor MaterialCopper, Tinned
Jacket (Insulation) MaterialPolyphenylene Ether, Modified (mPPE)
Jacket (Insulation) Diameter0.043" (1.09mm)
Jacket (Insulation) Thickness0.009" (0.23mm)
Length100.0' (30.5m)
Voltage600V
Operating Temperature-40�C ~ 105�C
Jacket ColorWhite, Blue Stripe
RatingsUL Style 11028
brandAlpha Wire

Recently Viewed

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Mechanical Latch Block

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Terminal

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 6000
32 Weeks
On Request

Trimpot

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Test Leads

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Terminal

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
25000 / 25000
16 Weeks
On Request

Meter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

TERMINATOR

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

HEAT SHRINK TUBE

Sumitomo Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
915 / 305
16 Weeks
On Request

Docking Frame

ODU

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Power Supply

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
2 Weeks
On Request

Switch

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
4000 / 1000
9 Weeks
On Request

Contactor

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

Nylon Based Insulated Terminal

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
8 Weeks
On Request

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
600 / 300
8 Weeks
On Request

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
8 Weeks
On Request

Delivery