• Part Number:
    6711 RD005
  • Manufacturer:
  • Description:
    Hook-Up Wire
  • Detailed Description:
    26AWG Hook-Up Wire 7/34 Red 600V 100ft(30.5m)
  • RoHS IconRoHSAuthorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Attributes

AttributeValue
Cable TypeHook-Up
Wire Gauge26 AWG
Conductor Strand7/34
Conductor MaterialCopper, Tinned
Jacket (Insulation) MaterialPolyphenylene Ether, Modified (mPPE)
Jacket (Insulation) Diameter0.038" (0.96mm)
Jacket (Insulation) Thickness0.009" (0.23mm)
Length100.0' (30.5m)
Voltage600V
Operating Temperature-40�C ~ 105�C
Jacket ColorRed
RatingsUL Style 11028
brandAlpha Wire

Recently Viewed

Resistor

Watts Electronics

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
5000 / 5000
4 Weeks
On Request
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 100
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Power Supply

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
6 Weeks

OFC Patch cords

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Film Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
16 / 16
22 Weeks
On Request

Connector

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
18 Weeks
On Request

Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Ferrule

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
12 Weeks
On Request

Contact

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
18 Weeks
On Request

Die Set

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks
On Request

Delivery