• Part Number:
    2843/19 YL005
  • Manufacturer:
  • Description:
    Hook-Up Wire
  • Detailed Description:
    26 AWG Hook-Up Wire 19/38 Yellow 250V 100ft(30.5m)
  • RoHS IconRoHSAuthorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Attributes

AttributeValue
Cable TypeHook-Up
Wire Gauge26 AWG
Conductor Strand19/38
Conductor MaterialCopper, Silver Coated
Jacket (Insulation) MaterialPolytetrafluoroethylene (PTFE)
Jacket (Insulation) Diameter0.031" (0.79mm)
Jacket (Insulation) Thickness0.006" (0.15mm)
Length100.0' (30.5m)
Voltage250V
Operating Temperature-60�C ~ 200�C
Jacket ColorYellow
brandAlpha Wire

Recently Viewed

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
2 Weeks
On Request

RESISTOR

Watts Electronics

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
2 Weeks
On Request
Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
16 Weeks
On Request

Pushbutton

Schneider Electric

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Ring Tongue Terminal

JST

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 1000
32 Weeks
On Request
Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 64
8 Weeks
On Request

Ring Terminal

Cembre

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
8 Weeks
On Request

Water Contact Indicator Tape

3M

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
16 Weeks
On Request

Hook-Up Wire

Alpha Wire

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
30 / 30
30 Weeks
On Request

Connector

Amphenol Communications Solutions

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
14000 / 1000
12 Weeks
On Request

Inusuation body

ODU

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks
On Request

Feed Through Header

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
250 / 250
5 Weeks
On Request

Temperature Controller

Schneider Electric

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Protective Cap

ODU

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks
On Request

Plug-in bridge

Phoenix Contact

Sold In: MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks
On Request

Delivery