• Part Number:
    1853 WR001
  • Manufacturer:
  • Description:
    Hook-Up Wire
  • Detailed Description:
    26AWG HookUp Wire 7/34 WHT/RD 600V 1000ft(305m)
  • RoHS IconRoHSAuthorized IconAuthorized
    • Duns Icon
    • Ecia Icon
    • ISO Icon
Franchise : Authorised Distributor

Product Attributes

AttributeValue
Cable TypeHook-Up
Wire Gauge26 AWG
Conductor Strand7/34
Conductor MaterialCopper, Tinned
Jacket (Insulation) MaterialPoly-Vinyl Chloride (PVC)
Jacket (Insulation) Diameter0.039" (0.99mm)
Jacket (Insulation) Thickness0.010" (0.25mm)
Length1000.0' (305m)
Voltage600V
Operating Temperature-55�C ~ 105�C
Jacket ColorWhite, Red Stripe
brandAlpha Wire

Recently Viewed

RESISTOR

Watts Electronics

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
5000 / 5000
2 Weeks
On Request

RESISTOR

Watts Electronics

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
2 Weeks
On Request

CAPACITOR

Alcon Electronics

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
On Request

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
305 / 305
30 Weeks
On Request

HEAT SHRINK TUBE

Sumitomo Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
2000 / 1000
16 Weeks
On Request

Contact

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
8000 / 8000
20 Weeks
On Request
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks
On Request

Connector

Amphenol

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
12 Weeks
On Request

Feed-through Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
10 Weeks

Colour Coded Copper Lugs

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
8 Weeks
On Request

Cable Assembly

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
14 Weeks
On Request

Sensor/actuator cable

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks
On Request

Capacitor

KYOCERA AVX

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
4000 / 4000
16 Weeks
On Request

Industrial Plug

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
6 Weeks
On Request

Contact

Radiall

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
10 Weeks
On Request

Terminal

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
4500 / 4500
16 Weeks
On Request

Delivery