Amar Radiohttps://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZF560022BengaluruIN
Amar Radio
73/19/5, Ashokapuram Main Rd Yeshwanthpur Industrial Suburb Bangalore – 560022, India | GST No. : 29AADFA3109M2ZFBengaluru, IN
+919902344474https://www.amarradio.com/s/64c8db09821840e583be8160/66cd698c3c359005ac7e5c88/arclogo-480x480.png"[email protected]
670ef23a7e39ce002b82d5da0034.60110034.6011

MSF 500mA,250VAC,Interrupt:35A,8.5x 8.5mm

ITM00416
INR11799998.82Out of Stock
Schurter
11

0034.6011

  • Manufacturer:
  • Manufacturer Part Number:

    0034.6011

  • Description:

    Glass Fuse

  • Detailed Description:

    MSF 500mA,250VAC,Interrupt:35A,8.5x 8.5mm

  • Datasheet:Datasheet Icon
  • IconIcon
Franchise : Authorised Distributor

Why you should choose ARC

Leading Authorized Distributor of Electronic Components since 1968

Product Attributes

#AttributeValue
1.SeriesMSF 250
2.Mounting TypeThrough Hole
3.Fuse TypeBoard Mount (Cartridge Style Excluded)
4.Current Rating(Amps)500 mA
5.Voltage Rating-AC250 V
6.Response TimeFast Blow
7.Breaking Capacity@Rated Voltage35A
8.Melting I�t0.09
9.Approval AgencyCCC, cURus, VDE
10.Size/Dimension0.335" Dia x 0.335" H (8.50mm x 8.50mm)
11.Package/CaseRadial, Can, Vertical
12.brandSchurter

Inventory on RFQ
? Add to quote to get stock availability and pricing.

Sold In :PCS
Minimum Order Quantity (MOQ): 500
Standard Packing Quantity (SPQ): 100
Lead Time: 9 Weeks
HSN Code:85361060

Pricing (includes all local taxes)

QuantityUnit Price
500On RFQ
?
Add to quote to get pricing.

Standard Lead Time: 9 Weeks

IconFor custom pricing and inventory info, add to quote
IconFree delivery on bulk orders
IconWe are an Authorized distributor
Icon

Frequently Asked Questions

The Request for quote feature (available for registered users only) allows you to select products you need and add them to your RFQ cart. You can then Request for a quotation with your Target Price and receive a customised offer.

To submit an RFQ, click the "Add to Quote" button for the product you need. Navigate to the RFQ cart on top right corner of your screen. Our team will respond with pricing, stock availability, lead times, and incoterms.

Yes, you must register to be able Request for Quote. And Yes, we do offer special pricing.

Typicaly 12-48 hours. However, it can take longer with some products. You are assigned a key account manager as soon as you place a RFQ, who will keep you updated about your request. any delays.

Yes. All our our products are purchased directly from the Manufacturer (or a pre-defined authorised channel). By default all warranties extended by the Manufacturer would extend to you as purchaser. And yes, we can provide a COC on request.
For more informationContact Us

Recently Viewed

Connector Header

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/ 3000
32 Weeks

EMI FILTER

Elcom

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/

LED Module

O/E/N

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 /
8 Weeks

Crimping Lug

Cembre

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
100 / 100
8 Weeks

Connector

3M

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
/
16 Weeks

Hook-Up Wire

Alpha Wire

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
305 / 305
30 Weeks

Glass Fuse

Schurter

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
500 / 100
9 Weeks

Connector

Amphenol Communications Solutions

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
200 / 200
12 Weeks

Terminal

APTIV

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
11500 / 11500
16 Weeks

Feed Through Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1300 / 50
6 Weeks

assembly set

ODU

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

PCB Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
9 Weeks

Soft Starter

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Terminal Block

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
50 / 50
5 Weeks

VFD

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
1 Weeks
Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

Connector

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
5 Weeks

Connector Housing

JST

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1000 / 1000
20 Weeks

VARIOFACE Module

Phoenix Contact

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1
8 Weeks

Vario Switch

Schneider Electric

Sold In:MOQ/SPQ Manufacturer Lead Time Price Per Unit
1 / 1

Delivery